久久婷婷国产|欧美成人精品二区三区99精品 |久久久久久久久久99精品|夫の137上司人妻中文字幕

Your Current Location :HomeNewsCompany News  ? Metal detector installation precautions

Service Hotline

+86 13711845437

Manager Zhang

Metal detector installation precautions

Source: Time:2022-08-08 15:35:20 views:

The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

1. Installation conditions of metal detector


Install this device in a location that meets the following conditions.

? Places where the temperature is not lower than 0°C and not higher than 40°C.

? Places with humidity in the range of 30~85% and no condensation.

? There is no direct sunlight, and there are no heating appliances such as stoves and heaters nearby.

? The fluctuation range of power supply voltage does not exceed ±5%.

? Away from vibration sources, places that are not prone to vibration.

? A place with less dust.

? Places without volatile flammables, corrosive gases and salt water.

? Places where the hot and cold air of the air conditioner does not blow directly against the equipment.



2. Precautions for installation of metal detector


The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

Please do not wire in multiple directions. If a heavy object is placed on the power cord, it will crush the cord and cause a fire or electric shock.

The power cord should be kept away from heating appliances. Before unplugging the power plug, you should turn off the power switch and pull out by holding the plug.

When this equipment is connected (connected) to other equipment (front and rear conveyors, etc.), malfunction may occur. In this case, please do not connect with other equipment and ground it separately.



3. Adjustment of the plane height of the conveyor belt between the metal detector and the front and rear devices


Adjust the plane height between the equipment and the front and rear conveyor belts to the same level. There should be no gaps between the device's foot bolts and the ground to avoid shaking. After adjustment, the brake nut must be tightened with a wrench.



4. Connection of power supply and grounding of metal detector


To avoid danger, install a circuit breaker in the middle of the power supply to this equipment. Also, if it is used in a humid environment, an earth leakage circuit breaker should be installed.

To avoid electric shock and ensure stable operation of this equipment, the power plug must be grounded. (Use a soft copper wire with a diameter of 1.6mm or a metal wire with equivalent strength that is not easy to corrode. The grounding impedance must be less than 100 ohms.)
Links

久久婷婷国产|欧美成人精品二区三区99精品 |久久久久久久久久99精品|夫の137上司人妻中文字幕

91久久精品国产| 欧美白嫩少妇xxxxx性| 久久不射影院| 人妻久久久久久| 久久久久久久国产精品影院| 欧美日韩一区二区在线播放| 屁屁影院网址| 免费在线观看av| 黑人精品xxx一区一二区| 亚洲精品一区二区三区99| av毛片免费观看| jizz亚洲妇女高潮喷水中文| 亚洲视频在线观看| 欧洲丰满熟妇bbbbbb| 欧美日韩人妻一区二区| а√天堂资源在线| 精品视频一区二区三区四区| 黄色女女啊| 欧美性色婷婷久久久精品| 香蕉乱码成人久久天堂爱免费| www.成人在线视频| 久久婷婷色| 人妻少妇91精品一区黑人| 久久舔| 国产一区二区三区91| 日本在线观看| 亚洲激情内射| 福利视频一区二区三区| 丰满熟妇人妻中文字幕| 肉大捧一进一出免费高清观看| 午夜天堂精品久久久久| 亚洲国产成人91精品| 中文字幕不卡av| 欧美肥婆性猛交丰满大屁股| 中文字幕在线免费观看| 91精品国产色综合久久不卡98| 日韩一区二区三区在线视频| 日韩精品一区二区三区在线观看| 亚洲熟女一区二区三区| 99这里只有精品| 亚洲精品乱码久久久久久|